2020 Road Resurfacing Project

Print
Press Enter to show all options, press Tab go to next option

The following roads are County Roads scheduled to be resurfaced for Somerset County:

CR533 Millstone River Road in Montgomery from Bridge E0204 over Pike Run to Route 206

CR525 Thompson Ave in Bound Brook from Route 22 to W. Union Ave

CR616 Washington Valley Road in Bridgewater/Warren from 700’ east of Eastbrook Road to 800’ west of Morning Glory Road

CR658 Blackwells Mills Causeway in Franklin from Bridge G0404 at Millstone River Road to Canal Road

CR518 Georgetown Franklin Turnpike in Montgomery from 500’ west of Research Road to 250’ west of Pine Brae Court

CR640 Lyons Road in Bernards from Mount Airy Road to Church Street

CR667 Elm Street in Branchburg from Pearl Street to Bridge C0601

CR667 Pleasant Run Road in Branchburg from Maple Ave to River Road

CR615 South Middlebush Road in Franklin from Route 27 to 800’ north of Blackwells Road

CR615 South Middlebush Road in Franklin from Buffa Drive to Amwell Road

CR525 Mount Horeb Road in Bridgewater from Washington Valley Road to Tower Road

CR525 Chimney Rock Road in Bridgewater from Washington Valley Road to 650’ south of Gilbride Road

CR525 Washington Valley Road in Bridgewater from Chimney Rock Road to Mount Horeb Road

CR627 New Centre Road in Hillsborough from Auten Road to Beekman Lane

CR659 Dryden Road in Bernardsville from Somerset County Boundary to Turnbull Lane

CR659 Turnbull Lane in Bernardsville from Dryden Road to Claremont Road

CR512 Liberty Corner Road in Far Hills from Route 202 to Route 287 Overpass

 

The following roads are Municipal roads to be resurfaced for the Borough of Somerville:

Mercer Street from W. High Street to Route 22

Davenport Street from W. High Street to Route 22

 

The following roads are Municipal roads to be resurfaced for the Borough of Millstone:

Colonial Road from Yorktown Road to Amwell Road

S. River Street from Millstone River Road to Amwell Road

N. River Street from Millstone River Road to Amwell Road

Alley Way from Ann Street to Amwell Road

 

The following roads are Municipal roads to be resurfaced for the Township of Bridgewater:

Beach Ave from Pine Street to Old York Road

Cross Road from Route 202 to Downey Road

Donald Drive from Thruway Drive to Thruway Drive

John Christian Drive from Ron Court to Garretson Road

Ron Court from John Christian Drive to End

Voorhees Lane from Garretson Road to Municipal Right of Way past Stryker Ct.

Wight Street from North Bridge Street to Hillside Ave