2018 Road Resurfacing Project

Print
Press Enter to show all options, press Tab go to next option

Roads to be resurfaced by Somerset County Engineering

Current schedule as of 4/9/2019:

The following roads are County Roads scheduled to be resurfaced in the Spring of 2019 for Somerset County:

Mon 4/8- Tues 4/9- Washington Rock Park, Township of Green Brook, Walking path reconstruction

Wed 4/10- Thur 4/11- CR654 East High Street & CR689 East Street, Borough of Bound Brook 9:00AM-4:00PM

Fri 4/12- Vosseller Ave in Bridgewater Township, Resurfacing of roadway from Glen Road to Township Boundary 8:00AM-4:00PM

TBD-CR610 Edgewood Terrace, South Bound Brook, from Canal Road to Elizabeth Ave and Elizabeth Ave to Main St.

TBD-CR636 Greenbrook Road, North Plainfield, E/B Lane from Rock Ave to West End Ave

POSTED 4/9/2019